ix
print this page

Teamer Field
New Construction
Tredyffrin/Easttown School District
Berwyn, PA

T/E School District's Teamer Field includes the reconfiguration and replacement of the existing High School stadium, new seating, team rooms, concession areas, entry plazas, and a press box. D+JA provided a new synthetic playing surface and field drainage system that greatly increase event scheduling and flexibility. Renewed fan interest was a side benefit of the new stadium as attendance during the opening football season increased 60% over previous years.

Don Pearse Photographers
Copyright © 2012 - Present, All Page Contents, Daley + Jalboot Architects Inc 
Site by Pre Design Studio